1. Ripping of large all weather track
The large all weather track was ripped today to a depth of 5 1/2" to relieve surface hardness as well as to achieve thorough mixing of 210 cubic metre of bark chip applied from 15 to 16 October 2015.
2. Verti-drain on Sha Tin turf track
The verti-drain was used on the Sha Tin turf track to alleviate surface hardness according to the following schedules:
29 September – 11 October
|
A to C Course
|
19 – 20 October
|
C+3 Course and the remaining area
|
On completion of the works, the areas were lightly rolled as per previous practice.