Ripping of large all weather track
20/11/2014
The large all weather track was ripped today to a depth of 5 1/2" to relieve surface hardness as well as to achieve thorough mixing of 30 tonnes of silt and clay and also 100 tonnes of fine river sand applied on 17 and 19 November 2014 respectively.